The Grizzly building (RA) is a multi-tenant building spanning over eight floors and offering approximately 11,000 m² Gross Floor Area (GFA) of which 9,700 m² are Gross Leasable Area (GLA). Approximately 30% of the Grizzly floor space will be allocated to offices and 70% to biological , analytical and chemical laboratories, including ML1 and ML2laboratories. On demand, spaces can also be allocated to cleanroom facilities. Leasable units vary from 50 – 250 – 500 – 1000 m² GLA.
The Grizzly building will provide space for a range of modern research facilities in a bespoke, yet flexible environment. A variety of conference rooms, co-working spaces, pantries and meeting places is distributed over the building, stimulating innovation, creativity and collaboration.. Connected by swirling staircases, these spaces become the vertical heart of the building. With two architecturally refined outdoor terracestenants will have access to areas of high quality open space, aiming to foster the sense of community. Integrating architecture, interior and landscape, the building will become a thriving and highly flexible first-class multi-tenant research facility. Pivot Park has embarked on a plan to invest in a dynamic and world-class research campus. The first phase of this visionary masterplan will be reflected in the Grizzly building.
Are you interested to join us at Pivot Park?
For more information download the brochure or talk to us directly.
Fill in the form and we’ll get in touch with you within 24 hrs.
The time is now!
or send us a message
Floor area
11,000 m² (118,403 ft²) GFA
9,700 m² (104,409 ft²) GLA
Office space (30%)
Laboratories (70%) including ML1 and ML2 Labs
Main entrance, reception, pantry and leasable units of 50-250 m² GLA for smaller companies.
2nd floor:
Leasable unit(s) of 50-250 m² GLA, co-working area, conference rooms and a meeting area.
3rd floor and 5th floor:
Leasable unit(s) of 250-1000 m² GLA, co-working area, pantry and outdoor terrace.
4th floor, 6th and 7th floor:
Leasable unit(s) of 250-1000 m² GLA, conference rooms and meeting area.
With regards to sustainability, the aim is to meet the requirements for a nearly zero-energy building. The installation of PV panels, fossil-free installations, solar control glazing, permanent facade louvers and LED lighting, will make Grizzly a sustainable energy building.
Start concept design
Submittal Planning
Start technical design
Start construction
Building completion
January 2020
Q1 2022
Q3 2023
Start concept design
Completion
January 2020
Q3 2023
Wiebe Daalderop, Real estate development manager
Give me a call or send me an e-mail
+31 (0)6 14 53 91 67
joinus@pivotpark.com
Kloosterstraat 9
5349 AB Oss
the Netherlands
To download our Grizzly brochure we would like to receive your e-mail.